Delivery & Installation

From Order to First Soak

We handle everything. Delivery, installation, commissioning, and a full handover so you know exactly how your hot tub works.

The Process

Seven Steps to Your First Soak

Most customers go from first visit to first soak in two to four weeks. Here's what happens along the way.

1

Choose Your Hot Tub

Visit our showroom, try a wet test, and pick the model that fits your garden and your budget.

2

Site Survey

Mark visits your property to check access, measure the space, and plan the best route for delivery.

3

Base Preparation

We give you clear guidance on base requirements. Most customers use a concrete slab or reinforced paving.

4

Delivery Day

Our team delivers your hot tub on a flatbed and positions it exactly where you want it. Side gate, rear access, or crane lift if needed.

5

Installation

We connect the plumbing, fill the tub, and run a full systems check. Your electrician connects the power supply.

6

Commissioning & Handover

We balance the water chemistry, walk you through the controls, and make sure you are confident with day-to-day care.

7

First Soak

That's it. Your hot tub is ready. We leave you with a starter chemical kit and our direct phone number if you ever need us.

Base Requirements

Getting the Foundation Right

Your hot tub needs a solid, level surface that can handle the weight. A filled hot tub with people in it can weigh over 2,000kg. That sounds like a lot, but a standard concrete slab handles it easily.

Mark covers all of this during the site survey. If your base needs work, we can recommend local contractors who do it regularly.

Suitable Bases

Concrete Slab

Minimum 100mm thick, steel-reinforced. The most common choice.

Reinforced Paving

Slabs on a solid sub-base. Must be level within 10mm.

Reinforced Deck

Timber or composite, built to carry the load. We can advise on specifications.

Access

We'll Get It There

Every garden is different. We've delivered hot tubs through narrow side gates, across fields, and over rooftops. Whatever the challenge, we'll find a way.

Side Gate

Standard delivery through a side gate. Minimum 80cm width.

Over the House

Crane lift over the roof. More common than you'd think.

Rear Access

Direct access from the back. Fields, driveways, paths.

Crane Lift

For gardens with no ground access. We arrange everything.

Electrical

Power Supply

Most hot tubs need a dedicated 32A supply, installed by a qualified electrician. A few entry-level models run on a standard 13A plug.

Each product page shows the exact electrical requirement. We can recommend local electricians who install hot tub supplies regularly.

32A Dedicated Supply

Required for most hot tubs and all swim spas. Hardwired by a qualified electrician with its own RCD protection.

13A Plug and Play

Available on selected entry-level models. Plugs into a standard outdoor socket. No electrician needed.

Where We Deliver

Hampshire and Beyond

We deliver and install across Hampshire and the surrounding counties. Free delivery within our standard area.

Southampton Portsmouth Winchester Fareham Basingstoke Chichester Salisbury Petersfield Eastleigh Gosport

Ready to Get Started?

Book a free site survey and we'll plan your delivery. Or just call us to talk it through.